Model 2157 for residential transfer switches up to 400A (See below notes **)
Model 2158 for commercial transfer switches (See below notes **)
The LOAD SHED A/C Install Kit has everything you need to install one Auxiliary Switch into the automatic transfer switch.
Included in kit:
- Fuse block
- Fuse
- Auxiliary switch
- One 6" wire with connectors
- One 1ft wire with connectors
- Two wire terminals
- Mounting hardware
Notes:
Two Installation kits are needed for the LOAD SHED A/C PLUS 60A and 100A
**Commercial Transfer Switches; Generac HTS and GTS Kohler KSS, ASCO